Turn your space into a sustainable source of income

Secure, long-term income without risk
Sustainable use of your land area
Transparent partnerships for a greener future
Your space is in good hands

The area is being built up with standardized storage containers, which are installed and maintained by Terra One partner companies. The grid connection is coordinated and implemented in consultation with the responsible network operator.

The space requirement depends entirely on the available and desired capacity at the substation. We are building 15 to 500 MW projects. 1500 to 2000 square meters are enough for a small 15 MW storage system. In order to implement larger projects, at least 1 hectare and more is required.

Big effect on a small area

Benefit from stable, long-term income by renting out your space for battery storage projects.

Example project: 100MW battery storage

A 100 MW battery storage system can be built on an area of 1 hectare — enough to supply 100,000 households for one hour. This project shows how space can be used efficiently and long-term income can be secured.
Batteriespeicher Megapack

Example project: 20MW battery storage

2,000 m² are enough for a 20 MW battery storage system, which helps municipalities and companies stabilize the grid. An ideal solution for the sustainable use of smaller areas.
Batteriespeicher
Your community, our energy

Our storage solutions offer long-term financial security, environmentally friendly use of your space and support the local economy — without any costs or risks. Together, we are shaping a climate-neutral future.

Safe income

Receive reliable rent payments over the entire term of up to 20 years.

No cost to you

We cover all project costs, including construction, operation and dismantling of the plants.

Sustainable use of your space

Your area will be part of a future-oriented project to promote renewable energy.

Flexible solutions

Our storage projects are individually adapted to the conditions of your space.

Transparent collaboration

Our partnerships are based on open communication and maximum transparency.

Positive effects on your region

Promote local economies and create sustainable development opportunities.
Your path to sustainable land use

Our implementation process for battery storage projects is clearly structured and ensures maximum transparency. From the initial inspection of your space to commissioning, we take care of all steps so that you can benefit from long-term income without effort.

Area check

Each possible project area is identified in an initial consultation and then checked for suitability by our experts.

Securing the network connection point

We submit a network request to the responsible network operator and clarify all technical requirements.

Contract negotiations

After securing the grid connection, you will receive an individual lease offer and we will clarify all contractual details.

Final project planning

After conclusion of the lease agreement, we prepare the detailed plan for the implementation of the project.

Approval by competent authorities

The project is submitted to the responsible building authorities and official approvals are obtained.

Construction and commissioning

After approval, the plant will be built. Depending on the size of the project, the construction phase takes around 6 to 12 months.

“Terra One shows how innovation and sustainability can go hand in hand to revolutionize the energy sector. ”

Annie Musgrove
journalist
FAQ

Frequently asked questions.

What types of projects are implemented by Terra One?
Terra One specializes in the implementation, construction and operation of large battery storage projects (BESS) starting at 15 MW.
What are the benefits of working together?
For land owners: Long-term and secure rental income over a period of at least 20 years.
For operators of wind and open-space PV systems: Use of excess capacity at private substations — additional income without restricting existing generation plants.
Which areas are eligible?
Agricultural or industrial areas of 3,000 square meters or more in the immediate vicinity of substations are suitable.
Are storage projects affecting my space?
Our systems save space and only minimally affect the use of your space.
How is the collaboration structured?
We rely on transparent contracts, regular communication and cooperation based on partnership.
Your contacts

Your space — our solution for the energy revolution.

Start your project today and make your space the basis for the energy supply of the future. Contact us via our form and we'll take care of the rest — simply, transparently and efficiently.
Laura Rosenbrock
Laura Rosenbrock
Acquisition Manager
Marvin Neumann
Marvin Neumann
Head of Acquisition
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.